6/27/12

In preparation for construction of our new Wellness Center in 2015, WSU Facilities will begin preparation work for an athletic modular building which will be situated in the current faculty parking lot behind Sullivan Academic Building. In order to adjust for those spaces being off-line, Facilities will be making the following changes to faculty parking arrangements on campus:

The existing faculty lot behind the Sullivan Building will come off-line and will be used for the Athletic modular building.

The existing faculty spaces by the Science and Tech Center will be changed to general parking. This is being done so that when the Wellness Center project begins, Facilities does not have to make additional changes to faculty parking.

The existing faculty spaces in front of the Administration Building will be changed to general parking. This is being done so that when the Wellness Center project begins, Facilities does not have to make additional changes to faculty parking.

The new faculty parking spaces (110 total) will be located in two (2) separate lots, one (1) between the Administration & Sullivan Buildings and one (1) directly behind the Administration Building.

Facilities will take care of striping and signage for the new lots.

All of these changes will take effect on July 1st, 2012. For clarification visit this link to see an image of the new faculty lots. Thank you for your patience.

Expires

 
Attachments
Created at 10/25/2012 3:18 PM  by White, Steven 
Last modified at 10/25/2012 3:20 PM  by White, Steven 
 
Related Links


DataBridge © WSU, 486 Chandler Street, Worcester, MA 01602
Phone: 508-929-8000